top of page

Week 18 Report

Group 5 - Eric Kong, Ayush Kumar, Luna Yang

Week 18 report

 

· We met with Mr. Trincal last week to discuss design options for the foot pedal and how we can move forward with that and he will be sending us some ideas through email

· We collected a rail and some bearings for it in order to be designing the multiple holding spots for the cuvette

· Our hope to is to at least to develop a working rail system that has multiple spots for cuvettes to sit on by this coming week.

· Individually, we are researching ways that a foot pedal system can be reliably built

· Ayush is looking into the software necessary for making the database and collecting the results of the pressure test.

bottom of page